Contract Generation · contract_generation Draft 25%
Draft progress · approved + skipped ÷ total 25%
Contract-only surfaces · flags ONcontract_generation
Unmet requirements · GAP 2
L.2.3Bonding letter required for contracts over $2M — not on file. Upload to Knowledge Center to resolve.
M.1.4NBIS certification copies for 2 named inspectors — pending from HR.
Rate table · L.5 Price Volume
GAP inventory is SEPARATE from [VERIFY] (FS_4). Section refs (L.4.2 / M.1) come from the analysis extraction. All three surfaces are registry flags — off for grant_generation.
SELF-CONTAINED DEMO · SCRIPTED RESPONSES · DS v4 TOKENS · HUMANDATA.ID/DS